Schedule an Inspection

SJCUD requires that anytime a property supplied with reclaimed water is to be activated, an inspection of the irrigation system must be completed first. This process requires that the resident contact SJCUD's Reclaimed Water Line (904) 209-2750, or contact our Reclaimed Water Coordinator at ReuseQuestions@sjcfl.us.

Please Note: The resident, or an irrigation company representative, will need to operate each zone of the irrigation system in the presence of a SJCUD inspector to ensure compliance with the Cross Connection Control Program. If the system is free of cross connections, the meter will be unlocked and activated.

For More Information

For more information or to schedule and inspection, please call the dedicated Reclaimed Water Line (904) 209-2750, or contact our Reclaimed Water Coordinator at ReuseQuestions@sjcfl.us.

 